PRODUCTION STANDARDS
Approve the right things before production.
Good production is not the absence of variation. It is clarity about the specification, proof route, tolerances, checkpoints and final acceptance.

BEFORE PRODUCTION
Make important decisions visible.
The exact approval route changes by category, but the principle is consistent: confirm the variables that will materially affect the finished result.
Specification
Dimensions, quantity, material, colour, branding, finish, packing and delivery requirements.
Artwork check
File suitability, bleed, resolution, colour references, decoration limits and variable data.
Proof / sample
Digital proof, mock-up, existing sample, white sample or pre-production sample as appropriate.
Approval
The agreed route moves into production only after the required approval point.
DURING & AFTER PRODUCTION
Check against the approved specification.
Process checkpoints
Checks appropriate to the material, process and project risk.
Finished QC
Quantity, visible defects, branding, assembly and packing checked at the level appropriate to the job.
Delivery handoff
Pack-out, allocation, labelling and installation/delivery requirements confirmed where scoped.
IMPORTANT REALITIES
Production has tolerances.
- Colour can vary by substrate, process, finish and production batch.
- Cutting, folding, stitching, engraving and assembly have practical manufacturing tolerances.
- Quantity over/under tolerances can apply to selected production methods.
- Rush timelines can reduce available proofing/sample options.
- Specialty finishes should be judged against an approved physical/sample reference where the project warrants it.
THE STANDARD
Clear brief. Clear approval. Controlled production.
That is the production discipline Creative Link should consistently apply.